RFI
Requirements & site information
Collect IT workloads, GPU/server types, rack plans, electrical connection, cooling boundaries, location constraints, compliance requirements and growth expectations.
SETEK / ENGINEERING METHODOLOGY
A documented, collaborative delivery method for modular data center and critical infrastructure projects.
RFI
Collect IT workloads, GPU/server types, rack plans, electrical connection, cooling boundaries, location constraints, compliance requirements and growth expectations.
BoD
Establish design assumptions, target capacities, operating temperatures, redundancy, maintainability, package boundaries and acceptance criteria.
DESIGN
Coordinate layouts, electrical single-line design, preliminary cooling flow diagrams, structural interfaces, service clearances, preliminary equipment list and budgetary scope.
REVIEW
Review design disciplines and responsibilities across supplier, factory integrator and site owner; assess power, liquid loops, heat rejection, transport, seismic constraints and site interfaces.
FAT
Define and witness the agreed functional and load tests, control logic, alarm sequences, electrical checks and cooling/leak tests before shipment.
SAT / IST
Verify installation and connections, commissioning and integrated tests. Complete acceptance records, as-built drawings, O&M documents and operator orientation.
Engineering calculations, scope, test procedures, certifications and lead times are defined per project, with the responsible parties.
Discuss your project ↗SETEK / MÜHENDİSLİK METODOLOJİSİ
Modüler veri merkezi ve kritik altyapı projelerini gereksinimden teslimata taşıyan, kayıtlı ve iş birliğine dayalı çalışma yöntemi.
RFI
IT iş yükü, GPU/sunucu tipleri, kabinet planı, elektrik bağlantısı, soğutma sınırları, saha kısıtları, uyulacak standartlar ve büyüme beklentileri toplanır.
BoD
Tasarım varsayımları, hedef kapasite, çalışma sıcaklıkları, yedeklilik, bakım koşulları, paket sorumlulukları ve kabul kriterleri tanımlanır.
DESIGN
Yerleşimler, elektrik tek hat yaklaşımı, soğutma akış diyagramları, yapısal arayüzler, servis boşlukları, ön malzeme listesi ve bütçe kapsamı koordine edilir.
REVIEW
Tedarikçi, fabrika entegratörü ve saha taraflarının sorumlulukları; güç, sıvı devreleri, ısı atımı, nakliye, sismik koşullar ve saha bağlantıları üzerinden birlikte incelenir.
FAT
Sevkiyat öncesinde üzerinde mutabık kalınan fonksiyon ve yük testleri, kontrol senaryoları, alarmlar, elektrik kontrolleri ve soğutma/sızıntı testleri uygulanır.
SAT / IST
Kurulum ve bağlantılar, devreye alma ve entegre sistem testleri doğrulanır. Kabul kayıtları, son durum çizimleri, işletme-bakım dosyaları ve operatör bilgilendirmesi tamamlanır.
Mühendislik hesapları, kapsam, test prosedürleri, sertifikasyon ve teslim süreleri projeye özel olarak sorumlu taraflarla belirlenir.
Projenizi görüşelim ↗SETEK / MÉTHODOLOGIE D’INGÉNIERIE
Une démarche collaborative et documentée pour concevoir, vérifier et livrer des infrastructures modulaires critiques.
RFI
Recueillir la charge informatique, les baies, l’alimentation, le refroidissement, les contraintes du site et les normes pertinentes.
BoD
Définir les hypothèses, capacités, températures, redondance, maintenance, interfaces et critères de réception.
DESIGN
Coordonner plans, schéma électrique, circuits thermiques, interfaces structurelles, accès de maintenance et liste des équipements.
REVIEW
Examiner les responsabilités du fabricant, de l’intégrateur et du site pour l’électricité, le refroidissement, le transport et les contraintes sismiques.
FAT
Réaliser les essais convenus de fonctionnement, charge, contrôle, alarmes, électricité et refroidissement avant expédition.
SAT / IST
Vérifier installation, raccordements, mise en service et essais intégrés; compléter les plans finaux, documents O&M et formation.
Les calculs, le périmètre, les essais, les certifications et les délais sont définis pour chaque projet.
Parler de votre projet ↗SETEK / منهجية الهندسة
عملية عمل موثقة وتعاونية لتصميم والتحقق من وتسليم مراكز البيانات المعيارية والبنية التحتية الحيوية.
RFI
جمع أحمال الخوادم والخزائن والطاقة والتبريد وقيود الموقع والمتطلبات التنظيمية وخطط التوسع.
BoD
تحديد الافتراضات والقدرات ودرجات الحرارة والتكرار والصيانة والمسؤوليات ومعايير القبول.
DESIGN
تنسيق التخطيط الكهربائي والحراري والإنشائي وممرات الصيانة وقائمة المعدات والتكلفة التقديرية.
REVIEW
مراجعة مسؤوليات المصنع والمكامل والموقع والطاقة والتبريد والنقل والقيود الزلزالية.
FAT
تنفيذ الاختبارات المتفق عليها للوظائف والأحمال والتحكم والإنذارات والكهرباء والتبريد قبل الشحن.
SAT / IST
التحقق من التركيب والتوصيلات والتشغيل والاختبارات المتكاملة وإكمال وثائق التشغيل والصيانة والتدريب.
تحدد الحسابات والنطاق والاختبارات والشهادات والمواعيد لكل مشروع مع الجهات المسؤولة.
ناقش مشروعك ↗